Solid Edge ST2 MP2 Released

Siemens PLM just released MP2 for Solid Edge ST2 on Friday January 8th. This patch includes many updates as well as fixes for user reported issues. It can be found here (webkey acct needed): http://ftp.ugs.com/solid_edge/ST2/

For those unfamiliar with what Maintenance Patches (MP) are, they are software updates that vendors of most applications deliver on a regular basis or "as needed" to resolve issues with the application or enhance the application. They are typically installed on top of a major version of an application, and are generally version specific.

In the case of Solid Edge ST2, you would need to run the MP for that particular version once ST2 has already been installed. MPs are typically "all inclusive" meaning that installing the latest MP includes the content of all earlier MPs (MP2 included MP1 updates as well as MP2 updates). If running Solid Edge along with Insight Server or Embedded Client, you will need to also install the same version of MP for these items as well (All must have MP2, not a mix of MP1 and MP2).
I hope you find this information usefull.

Ken

Comments

Popular posts from this blog

Solid Edge Replace Part Options

If you are not familiar with the Solid Edge Replace Part command, it is an Assembly based command used to do what the name implies… replace a part or sub-assembly with another part or sub-assembly. In past releases of Solid Edge, the Replace Part command was a solo act that had the ability of replacing a single part or sub-assembly occurrence or all occurrences of that selection with a user specified replacement part or sub-assembly that already existed. With the release of Solid Edge ST5 and subsequent releases, the Replace Part command was actually expanded into 4 different Replace Part commands, each with their own specific capabilities. Replace Part Replace Part is similar to the previous Replace Part command in that it is used to replace a part with one that has already been created, however it was expanded to allow not only the selection of a single occurrence or all occurrences of the selection, but also allows a user to select different parts and/or specified num...

Dimension Projection Line Breaks

Often when placing dimensions on drawings, the projection lines of some dimensions will cross the projection lines of other dimensions as shown below. Solid Edge provides a function to automatically create breaks in one extension line where it crosses another. This function is called "Add Projection Line Break". It is accessible from the Shortcut Menu when you have a dimension highlighted. The result is shown below. If you wish to remove the projection line break, highlight the dimension, invoke the shortcut menu, and select "Remove Projection Line Break".

Solid Edge ST7

Solid Edge ST7 is not due for release until July 2014, but it appears it is actively being worked on by SE Development as witnessed by a recent post from Dan Staples on the GTAC Solid Edge discussion group where he revealed a new enhancement by accident.  Whoops!  No worries, it was a simply a setting switch so he really didn't let much of the cat out of the bag (tip of a whisker?). The good news is that we have several more months till launch so he has plenty of time to reveal more about ST7, and knowing Dan, he might let a few teasers out just to keep things interesting. BETA should commence in early spring, and the official launch will occur at Solid Edge University 2014 in May.  No doubt Synchronous Technology based modeling will continue to be a focus, but it's anyone guess as to what the other areas of focus are...